Name
Denton Creek Regional Wastewater System Peak Flow Storage & Rehabilitation
Description
This project involved access shaft excavation, furnish and installation of 492 feet of 66-inch liner plate via hand tunneling followed by installation of 48-inch Hobas for gravity sewer, furnish and installation of 355 feet of 24-inch and 160 feet of 30-inch steel casing via pilot tube auger bore methods for respective electrical conduits and water line.