Engineer: Murraysmith
Start Date:
August 2021

Description: This project includes working as a Partner with MA Mortenson and others on two trenchless crossings that are part of a project that replaces 4,200 feet of 36-inch sanitary sewer with a 48-inch diameter sewer. Using guided auger boring methods to furnish and install 60-inch steel casing in 2 locations. Additionally, the project replaced four boardwalks, and provided wetland and stream habitat restoration within a nature park to improve stormwater management in the area.