Clint, TX
Owner: Lower Valley Water District
Start Date: October 2024
Description: The project involves the installation of 215 linear feet of 16- to 24-inch steel casing in three separate runs (70, 70, and 75 feet) beneath a highway. The work will be conducted in wet silts and sandy ground conditions.
